We pulled up our old berber carpet and tiles in front of our fireplace and got the floor ready for our new carpet to be installed.  Whew!  What a lot of work!  We painted the whole room, ceiling included while the old carpet was still down so if we spilled, no biggie.  Jeff ripped up the old carpet, the pad, and the fireplace tiles and removed and labeled the molding so we knew where to put it all back.  We plucked up the old staples and used the shop vac on the huge dust mess it left! 



Leave a Reply.